In choosing a word to summarize the past couple of days, only one comes to mind: Gangbusters! On Thursday, the remainder of the Superior Walls were set for 706-714, 4 of the modular boxes shipped out and the remaining homes are quickly getting their finishing...

High's in the upper 20's couldn't stop our progress! The crane and Superior Walls arrived on-site yesterday and after a little mechanical delay, they were rocking and rolling installing the foundation walls. These walls come with an R-13 value and are virtually waterproof, not to...

Things are getting pretty serious around here these days. We're pulling out all the stops to get the homes set and as you'll see from the photos, the finish line is rapidly approaching. Superior Walls are due to be set 12/15-16 and with any luck,...

It's getting down to crunch time. Excavation is going slowly, but surely and we are jamming to get the Superior Walls set next week so that the homes can be set the following week. In the factory, tile started going in, roofs were complete and...

The boxes are really starting to look like homes at this point. EPDM roofing has started to be installed, interior doors are getting set and cabinetry is appearing. For those wondering why the EPDM is black instead of white or some other reflective color, every...

They are going gangbusters at the factory these days. Flooring starting going down over the weekend and more windows are installed. It's also exciting to see our two specialty homes, Bmajor and 715 S. Bancroft (formerly known as Bminor) taking shape. Bmajor (aka 714 S....

On-site, the large excavator completed the majority of excavation and a mini-excavator is now in place to fine tune the excavation and help set the stone. In the factory, roof trusses that will make up the pitch of the roof patio are being installed and...

With the heavy rains yesterday, we had to take break from excavation, but thanks to the wonderful world of modular building, work continued at a steady clip in the factory. Electrical panels were installed and wired in some of the homes, more plumbing connections were...

Excavation started on-site on Monday for 706-714 and will continue for a week. Meanwhile, more and more Bancroft Green homes are going online at the modular factory. Today spray foam and mineral wool insulation started appearing on some of the walls and pex tubing and...